Skip to the list

15 issues. Catalog last refreshed .

Asset Reconstruction

Mainboard · book built · ARCIL · INE148G01016

GMP 6 days ago · bids 11 days ago

Minimum
₹14,873
Band
₹132–₹139
Issue size
₹732.97 Cr
GMP
₹12 (+8.63%)
Subscribed
3.39×

GMP rumours

₹12(+8.63%)

Implied ₹1,284 per lot, if the rumour holds — 107 shares × ₹12.

16 Sept · ₹1217 Sept · ₹12

Unofficial grey-market chatter. Not a price, not a prediction, and not from any exchange.

Subscription by category

Shares bid and times subscribed, by investor category
CategoryBidSubscribedChance
Retail (up to ₹2 lakh)6.26 Cr3.39×1 in 3
sHNI (₹2–10 lakh)3.58 Cr13.58×1 in 14
bHNI (₹10 lakh +)8.83 Cr16.74×1 in 17
Institutional (QIB)55.52 Cr52.65×1 in 53
All categories74.20 Cr20.10×

Value applied, by category

Where the money is, rather than how contested each line is. The two often disagree — a line can be the most subscribed and still be a small corner of the book.

Amount applied, share of the book, and the book counted in applications
CategoryAmountShare of bookCan be allotted
Retail (up to ₹2 lakh)₹870.61 Cr8.4%1,72,487
sHNI (₹2–10 lakh)₹497.63 Cr4.8%1,760
bHNI (₹10 lakh +)₹1,227.31 Cr11.9%724
Institutional (QIB)₹7,717.89 Cr74.8%
All categories₹10,313.45 Cr

Captured — refreshing

No financials published for this issue.

Most SME issues are not covered by any feed we have. The authoritative figures are in the red herring prospectus — the Documents tab links to it — and reading them directly is the work that replaces this panel.

What one bid costs

Priced at the top of the band, which is what gets blocked on a cut-off bid.

CategoryMinimumMaximumCeiling
Retail1 lot · ₹14,87313 lots · ₹1,93,349₹2,00,000
sHNI14 lots · ₹2,08,22267 lots · ₹9,96,491₹10,00,000
bHNI68 lots · ₹10,11,364no upper limit

Computed from the band by the same calculator that validates a bid before it is sent, so this table and the review sheet cannot disagree. A cut-off bid blocks at the upper band price, never the lower one.

The issue

Issue size
₹732.97 Cr
Face value
₹10
Lot size
107 shares
Daily window
10:00 – 17:00 IST

Timeline

Opens
9 Sept
Closes
11 Sept
Basis of allotment
15 Sept
Refunds
16 Sept
Listing
17 Sept

Documents